Sovereign Project

Tanzania - Msalato International Airport Construction Project

Tanzania · {'name': 'Dar es Salaam', 'coordinates': '-6.82349 39.26951'}, {'name': 'Dodoma', 'coordinates': '-6.17486 35.7379'}

Air transport · Public investment / AfDB sovereign financing

Estimated cost198.7m XDR
Financing soughtAfDB sovereign financing approved
Project structurePublic investment / AfDB sovereign financing
Target date2028-12-31
Sponsor / contactTANROADS -Tanzania National Roads Agency

COTZ

Tanzania

Description

The Msalato International Airport Construction Project is part of Tanzania's Five Year Development Plan, in line with Tanzania Development Vision (TDV) 2025. It has been designed because of the limited airport infrastructure, which hampers not only the development of markets, businesses and the industrial sector, but also job creation. The proposed intervention is likely to contribute to economic growth, which is equally important for the sustainability of the services that the Tanzanian government provides to its citizens. The project involves the construction of a brand new international airport with a passenger terminal, runway, air navigational aids and related operational services - specifically a fuel distribution company, water supply systems, electrical distribution stations and fire-fighting equipment. By enhancing transport connectivity from the centrally located Dodoma, the expanded airport is set to unleash gains from economic integration of the country with its regional neighbours and beyond. Expanding air connectivity spatially to dispersed centres of economic activities within and beyond Tanzania, has the potential to creating logistics related jobs and facilitating international trade and tourism. The project comprises four main components, namely: (i) civil works for the airport; (ii) air navigation equipment and fire fighting vehicles; (iii) institutional capacity building; and (iv) project management, audit and monitoring and evaluation.

Status
Ongoing
Last update
28 Sep 2026
Actions
Request Access→Access additional project documents and information. Request Introduction→Request an introduction to the sponsor or relevant public authority. Country IntelligenceNot available on your current plan.