Maamba Energy Thermal Power Plant Phase 2 (300 MW)
Zambia · {'id': 'location-28', 'address': {'region': 'Southern', 'locality': 'Sinazongwe', 'countryName': 'Zambia'}, 'geometry': {'type': 'Point', 'coordinates': [27.4667, -17.25]}, 'description': 'Sinazongwe, Southern, Zambia'}
Energy · Public infrastructure investment
Estimated cost300m USD
Project structurePublic infrastructure investment
Sponsor / contactMaamba Energy Limited
Zambia
Description
300 MW expansion of the Maamba coal-fired thermal plant at Sinazongwe, doubling installed capacity to 600 MW. Ground-breaking 13 Aug 2024; targeted completion mid-2026